Bookmark and Share
2016 Moved into new premises
2014 Purchased new showroom, training & warehouse premises at Upper Hill, Leominster to consolidate operations
2014 Introduced the Wind & Sun Solar Car Port
2014 Celebrated 30 years in business
2013 Announced winner of Solar Power Portal Award for "The best integration of solar generation as part of a total energy solution".
2013 Installed PV & wind battery/inverter system to bring 24hr power to the Isle of Muck Scotland
2012 Achieved ISO9001 and ISO14001 accreditation for “Renewable Energy Distribution and Installation"
2012 Supplied SMA inverters and REC modules to Birmingham, Warwick, Bromsgrove and Redditch, Warwickshire and Anglesey councils.
2011 Selected by Birmingham City Council as key frame supplier of PV system components
2010 Uk distributors for REC
2010 Installed battery inverter system on the Isle of Rum, Scotland.
2009 Installed SMA Sunny Backup system for CAT (Centre of Alternative Technology), Machynlleth.
2008 Isle of Eigg connected to the grid for first time with one of the country’s greenest power schemes.
A 1.5 million pound solar wind and hydro generating station. Wind & Sun designed and installed the battery inverter and PV systems
2007 Isle of Foula design and installation of the battery/inverter system and PV array on Britain’s most remote inhabited island 
2006 Flatholm Island design and installation of a renewable energy system combining both PV arrays and wind turbines, to power this historical island with SSSI status
2005 New eco office buildings constructed.
2004 UK distributors for OutBack inverters.
2003 UK’s first Sunny Island installation.
2003 UK service centre for Studer inverters.
2001 UK distributors for NRG wind monitoring equipment
1998 UK’s first domestic grid connected wind turbine.
Development of ‘Windy Boy’ in conjunction with SMA - Park Lane College and Heeley City Farm
1997 Moved to Humber Marsh Nature Reserve in Herefordshire.
1996 UK distributors for SMA
1996 UK’s first Sunny Boy installation - West Wales Eco Centre – leads to development of G77 & G83
1995 UK’s first PV roof tile installation - Homerton Grove Adventure Playground
1994 UK's first domestic grid-connected PV system - The Autonomous House
1993 UK distributors for BP Solar.
1993 UK distributors & Service Centre for Trace inverters.
1987 Constructed off-grid workshop and office in Watlington, Oxon powered by own wind turbine and PV modules.
1986 Introduced the first Wind & Solar stage lighting and PA system to Glastonbury Festival - still a feature to this day.
1984 Established.